|
|
HERITAGE
WOODS SECONDARY SCHOOL
- Client:
- Coquitlam School District #43
- Date of Completion
- November 2004
- Budget:
- Building: $14 million
- Sitework: $5 million
- Size:
- 11, 770 square metres
- Features:
- -325 seat theatre
- -three storey atrium
- Construction:
- Tilt-up concrete and steel frame
This 1200-student public secondary school is
designed in accordance with "Green Design" principles and features ventilation air to air heat recovery
systems, ground-source heating/cooling, water conservation measures, day-lighting, natural ventilation,
and on-site storm water retention, among others.
This is the first LEED certified school in BC, and the first school to achieve LEED Silver in Canada.
Architects:
KMBR Architects
|

above: installation of the ground source heating and cooling piping during construction
below: finished field over ground source system

above left: main entrance
above right: detail of east elevation, theatre exterior
below: south elevation, completed school
|