![]() |
||||||
|
|
|
PORT MOODY SECONDARY SCHOOL
The additions and renovations to this school were built in 2002. The gymnasium
(image below) was expanded and added to in this project. The 3 storey renovation to the right is the classroom block
that was built at the same time. Architects: CJP Architects
|
above left: view from road
below: gymnasium addition at left, classroom block at right
|
|
||
|
|
||
| Previous | Next | |